| The new state-of-the-art seawater system is taking shape at KML, designed to accommodate Ocean Acidification research. |
| Sept 2013: Then the installation of the degassing tower and the blower unit |
| Phase Two - Build-out of experimental treatment tanks (NSF Facilities Improvement Grant). Nov 2014: Heater/Chiller units delivered and placed on platform |
| Dec 2014: Constructing frames to hold seawater tables |
| A variety of 2 dozen experimental seawater tanks (45-gal to 1000-gal capacity) ready to plumb into the system. Water should be running in early 2015 and ready for use. |