28 March 2008
Classroom and Dry Lab ready for action!
Boasting new AC, electrical and plumbing throughout the building, a peek inside reveals a fresh look to cabinetry, counter tops, and workspace. Several groups have already taken advantage of the newly remodeled space.
Research Lab II is refurbished for our visiting scientists and the wet table will be plumbed once our new seawater system is functioning.
Our computer lab boasts a spectacular view of Florida Bay. Two computers, printers, and DSL access are available for our visitors.
KML is thinking Green
While staying on site, we are asking our guests to make the effort to separate all discarded glass, aluminum cans, and plastics into the appropriate bins.
KML’s on-site
“Reduce, Reuse, and Recycle”
21 March 2008
Sea wall & marina project is taking shape
The beautiful new sea wall at KML is really shaping up. This massive project began last fall with construction crews working long hours, often 6 days a week. The marina has been dredged and the big cranes and backhoes are gone now that the metal retaining wall is set, the pilings are in, and the boulders of rip-rap are in place.
Our new boat ramp is slowly materializing as concrete forms are pulled away. Quite a bit of work remains before the ramp and marina is usable.
The cement seawall cap is poured from the east end of KML, past the old observation deck and wet lab, and out to the old pump house. Progress has been slow but steady.